2016 Winter Stoppage Reopens On Time

The Whilton and Buckby flight is closed between 7th November and 13th December 2016 for Winter stoppage works:

Lock 8 gate replacement and brickwork repairs; out with the old and in with the new.

img_0759 img_0639

img_0769

Lock 10 refacing of the off-side chamber wall; out with the old and in with the new.

img_0758 img_0768

Posted in WBLA's Warbles.